Data Center UPS Battery System
Application
Description
High-reliability battery systems for data center UPS applications with scalable configurations and advanced monitoring for mission-critical infrastructure.
Core Advantages
Recommended Bill of Materials (BOM)
| Item | Part Number | Description | Quantity | Datasheet |
|---|---|---|---|---|
| 1 | 12V100AH | 12V 100Ah High-Rate VRLA Battery | 32 | 📄 Download |
| 2 | Battery Cabinet | UPS Battery Cabinet with Breakers | 2 | 📄 Download |
| 3 | Battery Monitor | Intelligent Battery Monitoring System | 1 | 📄 Download |
Technical Specifications
Customer Success Stories
Cloud Data Center Operator
Data Center | UPS Battery System
Challenge
The customer needed a reliable UPS battery system for a new 2MW data center with limited battery room space and requirement for 10-year service life.
Solution
We designed a 384V 100Ah battery system using Narada high-rate batteries in compact cabinets. The system included intelligent monitoring integrated with their DCIM platform.
Results
The system achieved the required 8-minute runtime at full load while fitting within the allocated space. After 5 years of operation, battery capacity remains above 95% of rated.
FAE Expert Insights
Michael Wang
Principal FAE - Data Center Power
18 years
Professional Insights
Key considerations: Use batteries specifically rated for high-rate discharge; Verify actual capacity at UPS discharge rates, not just 20-hour rate; Design for proper airflow - UPS rooms can get hot; Include monitoring with integration to DCIM or BMS; Plan maintenance access without taking UPS offline. Common pitfalls to avoid: Using standard telecom batteries not rated for high-rate discharge; Inadequate ventilation leading to thermal runaway; Poor maintenance access design requiring UPS shutdown; Insufficient monitoring to detect weak cells before failure.
Key Takeaways
- Use batteries specifically rated for high-rate discharge
- Verify actual capacity at UPS discharge rates, not just 20-hour rate
- Design for proper airflow - UPS rooms can get hot
- Include monitoring with integration to DCIM or BMS
- Plan maintenance access without taking UPS offline
Decision Framework
Decision Framework
Steps:
- Evaluate requirements
- Compare solutions
- Consult FAE